Multi-Use Trails

Trails In Progress

Middle Sound Loop Road- Red Cedar Road to Market Street Publix
Phase:  Design FY2020-21;  Construction to start FY2021-22
-Off-road paved multi-use trail
-Funded by a Surface Transportation Block Grant through the Wilmington Urban Area Metropolitan Organization (WMPO)

Market Street- Mendenhall Drive to Porters Neck Walmart
Phase:  Design FY2020-21;  Construction to start FY2021-22
-Sidewalk along Market Street from Marsh Oaks to Walmart
-Funded by a Surface Transportation Block Grant through the WMPO

Ogden Park Connector- Market Street to Ogden Park
-NHC is partnering with NCDOT to extend the Middle Sound Loop trail from Market Street along Lendire Road and Ogden Business Lane to Ogden Park.

North College Road- Gordon Road to Northchase Parkway
Phase:  Design FY2021-22
-Off-road paved multi-use trail

South College Road- 17th Street Extension to Monkey Junction
Phase:  Design FY2021-22
-Off-road paved multi-use trail

Completed Trails

Middle Sound Greenway Trail

The Middle Sound trail consists of on-road bicycle lanes on Red Cedar Road, an eight-foot wide paved off-road multi-use path along Middle Sound Loop Road from Red Cedar to Middle Sound Village, on-road path along Oyster and Bright Leaf Road, and a pedestrian path to Thais Trail.  The 1.3-mile trail connects to the Cross City Trail by way of existing bike lanes along Covil Farm Road to Military Cutoff Road.  There is also a new sidewalk from Ogden Elementary School to Kenmore Drive.

« Back to news overview

NHC Parks & Gardens Office: 896 Airlie Road, Wilmington, NC 28403 • Phone 910-798-7620 • Fax 910-798-7621
Skip to content